New power line in Pg. Exposició and Pg. Miramar
Between September and November, in two sections, the opening of the access trench means cancelling two rows of parking and services to leave a traffic lane operating in each direction. Work will be carried out during regular hours, from 8 am to 6 pm.
Passeig de Miramar, between Carrer Nou de la Rambla and Carrer de la Font Trobada: from Thursday 21 September to Friday 20 October. Opening of the access trench on the side nearest Av. Paral·lel, occupying the services lane and part of the downhill traffic lane. The services lane on the other side of the road, nearest Montjuïc, will be temporarily changed to leave one lane of traffic in each direction.
Passeig de l’Exposició, between Carrer de Blasco de Garay and Carrer del Poeta Cabanyes: from Wednesday 18 October to Friday 17 November. Opening of the access trench on the side nearest Av. Paral·lel, occupying the services lane and part of the traffic lane in the direction of the Llobregat. The services lane on the other side of the road, nearest Montjuïc, will be temporarily changed to leave one lane of traffic in each direction. On working days to be defined, the trench will cross over, meaning closures to traffic in the streets of Tapioles, Margarit (with Anníbal) and Blasco de Garay. A cul-de-sac will be in place in the section of Carrer de Blasco de Garay, between Anníbal and Pg. Exposició.
Tags associated with the news item
Related news
-
Urban planning and infrastructures
Urban planning and infrastructuresNew high voltage line between La Bordeta and El Poble-sec
19/09/2022 19:32 h
-
Mobility and transport