La Marina del Prat Vermell
The transformation of the Marina del Prat Vermell and its surroundings is one of the great projects that the city will face in the immediate future. It is a long-term development plan and therefore the management and monitoring of its implementation will be of vital importance in the context of a strategic vision such as the one proposed in the Coastal Plan.
The strategic and management instruments that regulate the transformation process in the area formed by the La Marina neighbourhoods should have an impact on the connection and integration of the area with its surroundings, in addition to promoting social and spatial cohesion and participative development. A full road map should also be proposed, for both the short and long term, in order to guarantee urban management adapted to the reality of the territory in such fundamental issues as habitat, the quality of the urban areas, and the connection of the area with the surrounding areas and the coastline.
What are we doing?
-
Planning and management: The urban improvement plans (PMUs) for sectors S1 (pending initial approval), S2, S3, S6, S8, S9, S10 and S14 have received final approval.
-
Land reallocation: Definitively approved in sectors S2, S3, S8, S10 and S14, while land reallocation projects have begun in sectors S6 and S9.
-
Residential and tertiary development: Overall, Marina del Prat Vermell is progressing with strong construction activity and steady population growth. Several sectors have ongoing or completed housing developments, as well as land available for future educational, healthcare and community facilities. New tertiary and public-service projects are also being processed.
-
Urban development and public spaces: Numerous urban development works have been carried out in sectors 3, 8 and 10, and the first phase of the Tretze Roses Park (17,950 m²) has been completed. Street works are continuing in parallel with housing construction.
-
Infrastructure: The new electrical substation that will serve Marina, Zona Franca and the Port has been completed. The eco-energy network is currently being rolled out, alongside works to connect regenerated water within the area.
-
Other initiatives: The new green point in sector 14 is under construction, and new green areas and facilities –such as the Marina Library and Civic Centre– are soon to be developed.