News
Showing 10 results.
-
06/09/2024 - 09:47 h Mobility and transport “Open streets” is back this weekend
We’ll be able to enjoy “Open streets” again in Gran de Gràcia and Sants - Creu Coberta as from 7 and 8 September, from 10 am to 9 pm.
-
20/08/2024 - 14:10 h Mobility and transport TMB bus depot at Triangle Ferroviari will be the city’s first all-electric facility
Electrification of the Ferroviari Triangle depot continues, with an eye to becoming fully electric by 2026.
-
11/08/2024 - 11:05 h Environment and sustainability Groundwater network upgraded to improve drought resilience
The systems in Alfons el Magnànim, Palau Reial, Eixample and Can Batlló will be extended.
-
29/07/2024 - 14:00 h Urban planning and infrastructures The Barcelona City Council challenge prototypes are now starting to provide shade
Rambla de Badal, 113, the Blau Museum zone and Plaça Comercial in El Born are the three spaces where the Barcelona City Council ephemeral shade challenge prototypes are being installed, to generate shade in public space.
-
17/07/2024 - 14:24 h Urban planning and infrastructures More than 22 hectares of new greenery and 216 spaces with shade for a healthier city
The Local and Interior Spaces Programme will renew unused spaces in all neighbourhoods.
-
15/07/2024 - 19:07 h Urban planning and infrastructures More space for pedestrians and sustainable transport with the remodelled Av. Diagonal
The section between C/ Los Castillejos and Pg. Sant Joan has been transformed.
-
11/07/2024 - 14:38 h Education and studies Work gets under way on Barcelona’s climate control plan in 24 schools
The climate-control measures will benefit some 8,300 students at city schools.
-
10/07/2024 - 10:49 h Environment and sustainability New commitment to speed up decarbonisation and foster water savings in the city
Presentation of the new Citizen Commitment for a More Sustainable Barcelona 2024-2034.
-
02/07/2024 - 13:16 h Housing Barcelona tests three new prototypes to enlarge and improve housing
The three winning projects in the challenge to regenerate housing blocks with innovative and sustainable systems, launched by BIT Habitat and the Municipal Institute for Urban Planning, are being tested on a UPC site in Sant Adrià de Besòs.
-
28/06/2024 - 15:28 h Environment and sustainability Back to the alert stage of the drought protocol
The Government of Catalonia has decreed an end to the exceptional stage, in place since 13 May, given the recovery of water levels in reservoirs, which are now above 38%.